Hi Peter,

I think you might actually have a CO :blush:

Have you done your medicals and PCC's yet? If not, I'll book them asap.

Sure you won't have long to wait, hang in there.

Michele you are right I did get a CO today, my agent just emailed me, CO is requesting for MED and PCC:)

Now I have to go book for med:)

Peter

Link to comment
Share on other sites

  • Replies 604
  • Created
  • Last Reply

Top Posters In This Topic

  • Michele R

    83

  • Kit

    58

  • JacquesV

    20

  • elleneo

    17

Top Posters In This Topic

February '08

Pieter&Rene.... 2008-03-06 - VISA GRANTED!!!!!!! 03 July 2009

HouseInOz ..... 2008-03-07 - VISA GRANTED !!!!!! 01 July 2009

Pygmalion ...... 2008-03-30 "26/03/09 - VISA GRANTED!"

April '08

Lisa..................2008-04-02

Gena ............. 2008-04-04 - Case officer 2009-05-01

sa2auz ........... 2008 -04-07 - Changed to ENS got it within 7 days

elize................ 2008-04-08 - Changing our application to ENS.... sick of waiting!

Tobold..............2008-04-09 - Granted 1st May 2009

Moose..............2008-04-09 - Visa approved 23/03/2009

Katy............... 2008-04-15

Scotts............. 2008-04-18 - Case officer received 2009-03-19 (Java developer)

Taegan ...........2008 -04-24 - Processing Further 2009-03-15. Changing our application to ENS.... also sick of waiting! UPDATE - PR - ENS856 Approved after 5 working days!

May '08

Lion King .........2008-05-08

Overberger ..... 2008-05-09 - Got CO requesting further info 2009-03-24, submitted all on 2009-03-27, still waiting!!!

Clarry .............2008-05-09

Sagewood .......2008-05-13 - Got CO requesting further info 2009-03-20, submitted all on 2009-03-24, still waiting!!!

psxkim .......... 2008-05-29 - Visa Granted 30 March 2009

Impatient........2008-05-12 - Got CO requesting further info on 2008-03-23

ajvr.................2008-05-20 - Got CO requesting further info on 2008-03-26 submitted all on 2009-03-30. Visa granted 24/04/2009

June '08

KimH...............2008-06-01

Wizard ........... 2008-06-03 Accountant CSL

Nolan ............. 2008-06-03 - Accountant CSL - VISA GRANTED!! - 03/04/2009

gljackson..........2008-06-06 Update - Processing Further - Documents updated to met - Requested Evidence of Specific Work Experience

Darkwing..........2008-06-20

Scarlet ........... 2008-06-28

July '08

Simpsons.........2008-07-13 - Metal machinist 4112-13

Sysie ............. 2008-07-14 - CO 3 April, VISA APPROVED !!! 1 May 2009

Bhs.................2008-07-16

Tsunabi...........2008-07-18 - Accountant - CSL

frenchie...........2008-07-23

martinp...........2008-07-27 - IT - UPDATE - Processing Further 27 Feb 09

August '08

Zambeze..........2008-08-06

OZNSW............2008-08-07 Changing to ENS. Company nomination goes in tomorrow.

Will_S..............2008-08-11 Case Officer 23-Apr-2009 - 1 Jun 2009 pre-grant letter: Visa granted 13 July 2009

The Krugers.....2008-08-11 Case Officer 23 April 09 - requested further information. VISAS GRANTED 19 JUNE 2009!!!!

Esthee..............2008-08-13

alanb...............2008-08-16 Lodged | 2009/4/24 - CO assigned. Requests PCCs | 2009/5/13 - Sent PCCs | 2009/7/20 - VISA GRANTED!

September '08

Xiongpaw ........ 2008-09-03 - J2EE Developer

Kevin Hoyle .... 2008-09-04 - J2EE Developer / CO - 2009-05-01 / PCC - 2009-07-06 / GRANTED - 2009-08-07!!!!

Duppies .......... 2008-09-04 - Accountant - Case Officer 1 May 2009 - requesting medicals

LisaS .............. 2008-09-10

mac4 .............. 2008-09-15 - 16 April changed to ss Qld

Du Toits............2008-09-26 - Visa Granted 21 May (CO 8 May)

Christo&Marie L. 2008-09-25 - Visa granted (Accountant). With no CO!: 8 May 2009!!

Vaalrivier ........ 2008-09-27 - Civil Eng / CO - 01.05.09. / Visa granted: 15.07.09

Cyberdeth ....... 2008-09-28 - GOT'S A CO 1 June, 13 days from B'day tooo, need to change some info on application though

October

elleneo.........2008-10-13-IT CSL ; 15 May'- Case Officer assigned..APPROVED 9 JULY 2009!!

tezi..............2008-10-23 CSL; 15 May - Case officer assigned requesting Aus Fed PC's. (Auckland here we come)..APPROVED 30 JUNE 2009

November '08

Wantbetter.......2008-11-01

Hennie-Pennie....2008-11-05-IT-CSL 12/05/2009 App processed further 22/05/09 CO requested PC,s 20/07 all PC's lodged 27/07/09- VISA GRANTED!!!!

Diveup ........... 2008-11-26 - Aircraft Maintenance Engineer - CSL - 22/05/2009 - CO 26-5-2009 -PC (today) Medicals completed.....waiting -VISA GRANTED!!!

Biker ............. 2008-11-28 - Got CO 25/05/2009. Request more info. Payslip for Sept 2007, Namibian PCC- WTF? UUrrgghhh! Granted 10 July- Finally!

December '08

Zet ...............2008-12-09 Accountant - CSL 25/05/2009 Application being processed further. Case Officer assigned..requests pc's.12 months payslips.

Waglio ............ 2008-12-12

DirtBiker...........2008-12-18 Accountant 175 CSL June 2009 Pcc and proof of earning and payslips.

GRANTED 22 JULY 2009

January '09

Cramer .......... 2009-01-02

Andi & Gunther 2009-01-16 Visa granted 22/09/2009 175 MODL, non CSL

March '09

Jacques and Natalie... 2009-03-06 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-03) -(CO requesting Medicals, PC and payslips for past 2 years)

Emile & Ilanie...2009-03-14- (Accountant CSL) (Application being processed further 2009-09-07)

Michele R & Steve......2009-03-20 (Application being processed further 2009-09-07 (CO Requesting resubmit of my birth cert and submit Form 80 - 2009-10-07) (Application granted.....2009-10-09!!!!)

BevF ............... 2009-03-31

PeterHein ........ 2009-03-31(Application being processed further, CO requesting Medicals and PCC 2009-10-12)

June '09

Alfresco........... 2009-06-15 - .NET Technologies

Frank & Leon.... 2009-06-16 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-21)

September '09

BenP....................2009-09-07 (Application being processed further 2009-10-01)

Carl S..................2009-09-15 (Application being processed further 2009-10-01)

Link to comment
Share on other sites

Hi Peter

Exciting times ahead. Holding thumbs you'll be posting a "GOT IT" very soon!

Thanks BevF :blush: yep I can't wait

Link to comment
Share on other sites

You don't have long to wait any more Peter, how exciting! :ilikeit:

And then more hard work begins (like deciding on movers, getting a job, etc) Definitely exciting times.

Hope the PCC's don't take too long (the power of positive thinking!)

Link to comment
Share on other sites

February '08

Pieter&Rene.... 2008-03-06 - VISA GRANTED!!!!!!! 03 July 2009

HouseInOz ..... 2008-03-07 - VISA GRANTED !!!!!! 01 July 2009

Pygmalion ...... 2008-03-30 "26/03/09 - VISA GRANTED!"

April '08

Lisa..................2008-04-02

Gena ............. 2008-04-04 - Case officer 2009-05-01

sa2auz ........... 2008 -04-07 - Changed to ENS got it within 7 days

elize................ 2008-04-08 - Changing our application to ENS.... sick of waiting!

Tobold..............2008-04-09 - Granted 1st May 2009

Moose..............2008-04-09 - Visa approved 23/03/2009

Katy............... 2008-04-15

Scotts............. 2008-04-18 - Case officer received 2009-03-19 (Java developer)

Taegan ...........2008 -04-24 - Processing Further 2009-03-15. Changing our application to ENS.... also sick of waiting! UPDATE - PR - ENS856 Approved after 5 working days!

May '08

Lion King .........2008-05-08

Overberger ..... 2008-05-09 - Got CO requesting further info 2009-03-24, submitted all on 2009-03-27, still waiting!!!

Clarry .............2008-05-09

Sagewood .......2008-05-13 - Got CO requesting further info 2009-03-20, submitted all on 2009-03-24, still waiting!!!

psxkim .......... 2008-05-29 - Visa Granted 30 March 2009

Impatient........2008-05-12 - Got CO requesting further info on 2008-03-23

ajvr.................2008-05-20 - Got CO requesting further info on 2008-03-26 submitted all on 2009-03-30. Visa granted 24/04/2009

June '08

KimH...............2008-06-01

Wizard ........... 2008-06-03 Accountant CSL

Nolan ............. 2008-06-03 - Accountant CSL - VISA GRANTED!! - 03/04/2009

gljackson..........2008-06-06 Update - Processing Further - Documents updated to met - Requested Evidence of Specific Work Experience

Darkwing..........2008-06-20

Scarlet ........... 2008-06-28

July '08

Simpsons.........2008-07-13 - Metal machinist 4112-13

Sysie ............. 2008-07-14 - CO 3 April, VISA APPROVED !!! 1 May 2009

Bhs.................2008-07-16

Tsunabi...........2008-07-18 - Accountant - CSL

frenchie...........2008-07-23

martinp...........2008-07-27 - IT - UPDATE - Processing Further 27 Feb 09

August '08

Zambeze..........2008-08-06

OZNSW............2008-08-07 Changing to ENS. Company nomination goes in tomorrow.

Will_S..............2008-08-11 Case Officer 23-Apr-2009 - 1 Jun 2009 pre-grant letter: Visa granted 13 July 2009

The Krugers.....2008-08-11 Case Officer 23 April 09 - requested further information. VISAS GRANTED 19 JUNE 2009!!!!

Esthee..............2008-08-13

alanb...............2008-08-16 Lodged | 2009/4/24 - CO assigned. Requests PCCs | 2009/5/13 - Sent PCCs | 2009/7/20 - VISA GRANTED!

September '08

Xiongpaw ........ 2008-09-03 - J2EE Developer

Kevin Hoyle .... 2008-09-04 - J2EE Developer / CO - 2009-05-01 / PCC - 2009-07-06 / GRANTED - 2009-08-07!!!!

Duppies .......... 2008-09-04 - Accountant - Case Officer 1 May 2009 - requesting medicals

LisaS .............. 2008-09-10

mac4 .............. 2008-09-15 - 16 April changed to ss Qld

Du Toits............2008-09-26 - Visa Granted 21 May (CO 8 May)

Christo&Marie L. 2008-09-25 - Visa granted (Accountant). With no CO!: 8 May 2009!!

Vaalrivier ........ 2008-09-27 - Civil Eng / CO - 01.05.09. / Visa granted: 15.07.09

Cyberdeth ....... 2008-09-28 - GOT'S A CO 1 June, 13 days from B'day tooo, need to change some info on application though

October

elleneo.........2008-10-13-IT CSL ; 15 May'- Case Officer assigned..APPROVED 9 JULY 2009!!

tezi..............2008-10-23 CSL; 15 May - Case officer assigned requesting Aus Fed PC's. (Auckland here we come)..APPROVED 30 JUNE 2009

November '08

Wantbetter.......2008-11-01

Hennie-Pennie....2008-11-05-IT-CSL 12/05/2009 App processed further 22/05/09 CO requested PC,s 20/07 all PC's lodged 27/07/09- VISA GRANTED!!!!

Diveup ........... 2008-11-26 - Aircraft Maintenance Engineer - CSL - 22/05/2009 - CO 26-5-2009 -PC (today) Medicals completed.....waiting -VISA GRANTED!!!

Biker ............. 2008-11-28 - Got CO 25/05/2009. Request more info. Payslip for Sept 2007, Namibian PCC- WTF? UUrrgghhh! Granted 10 July- Finally!

December '08

Zet ...............2008-12-09 Accountant - CSL 25/05/2009 Application being processed further. Case Officer assigned..requests pc's.12 months payslips.

Waglio ............ 2008-12-12

DirtBiker...........2008-12-18 Accountant 175 CSL June 2009 Pcc and proof of earning and payslips.

GRANTED 22 JULY 2009

January '09

Cramer .......... 2009-01-02

Andi & Gunther 2009-01-16 Visa granted 22/09/2009 175 MODL, non CSL

March '09

Jacques and Natalie... 2009-03-06 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-03) -(CO requesting Medicals, PC and payslips for past 2 years)

Emile & Ilanie...2009-03-14- (Accountant CSL) (Application being processed further 2009-09-07)

Michele R & Steve......2009-03-20 (Application being processed further 2009-09-07 (CO Requesting resubmit of my birth cert and submit Form 80 - 2009-10-07) (Application granted.....2009-10-09!!!!)

BevF ............... 2009-03-31

PeterHein ........ 2009-03-31(Application being processed further, CO requesting Medicals and PCC 2009-10-12)

June '09

Alfresco........... 2009-06-15 - .NET Technologies

Frank & Leon.... 2009-06-16 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-21)

July '09

Brendon & Sarah .... 2009-07-22 - Java Specialist 175 CSL

September '09

BenP....................2009-09-07 (Application being processed further 2009-10-01)

Carl S..................2009-09-15 (Application being processed further 2009-10-01)

Added the following :

July '09

Brendon & Sarah .... 2009-07-22 - Java Specialist 175 CSL

Link to comment
Share on other sites

PS: Michelle R, you seem to know when CO's are allocated, mind telling our fortune? :whome:

:) It seems at the moment, when your application is being processed further, chances are quite good you have a CO.

They seem to really be working hard on the 175's at the moment, so hopefully you won't have that long to wait!

Keep us updated and welcome to the CSL list!

Link to comment
Share on other sites

HI M,

Our status changed on 21/9 to App being processed further, but have not heard anything from a CO...:)

Can you predict ours? lol.....our medicals and police clearances are already loaded....

Link to comment
Share on other sites

HI M,

Our status changed on 21/9 to App being processed further, but have not heard anything from a CO...:)

Can you predict ours? lol.....our medicals and police clearances are already loaded....

Same here... status changed on 07/09 but haven't heard anything yet...but everything is loaded too.

Link to comment
Share on other sites

On my status everything else is "met" except for Medical and PCC as shown "requested".

I did medical this morning though...

I think next few weeks will seem really long.

Link to comment
Share on other sites

Update: 14/10/2009 Everything changed to "Met" except work experience "Requested", no email requesting anything yet, but probably payslips. Will wait and see.

Link to comment
Share on other sites

Finally got our CO today...so we are off to do our medicals.......what a pick me up after the 23 Sept changes......thought this day was not going to arrive.....for all the rest of you...hang in there!!!

See my details got lost somewhere along the line but it is as follows....

DannyBoy.........2009-03-20 (case officer assigned 16 Oct 2009...need to do medicals within 28 days)

Link to comment
Share on other sites

August CSL applicants are getting CO's assigned, anyone here in August boat??

Looks like CSL apps are moving at a seriaaas rate of knots...keep it up boys :rolleyes:

Edited by benp
Link to comment
Share on other sites

August CSL applicants are getting CO's assigned, anyone here in August boat??

Looks like CSL apps are moving at a seriaaas rate of knots...keep it up boys :rolleyes:

Things have really started moving!

Good luck to those waiting, it seems like it won't be long! :ilikeit:

Link to comment
Share on other sites

We launched in June but still no CO..our status changed to "being processed further" in Sept. I know it changes if you request info or upload new info, but we did none of that....I guess we just wait somemore..should they not be doing the CSL in order of lodgement? How do August CSL's get CO's before us ;(

Link to comment
Share on other sites

Hi, how do you know if you have a CO? The Australian Embassy contacted my husband’s employer and our status changed on the 10/09/2009 to application processed further. We have only lodged our application on the 16th August this year???????

Link to comment
Share on other sites

We launched in June but still no CO..our status changed to "being processed further" in Sept. I know it changes if you request info or upload new info, but we did none of that....I guess we just wait somemore..should they not be doing the CSL in order of lodgement? How do August CSL's get CO's before us ;(

Hi,

It seems that when your application is being processed further, it means you have a CO, so I'd relax and make sure all your documents are ready. We only got contacted by our CO because we had to fill out form 80 and resubmit my birth certificate.

The different CO's seem to work at different speeds, so hang in there!

Link to comment
Share on other sites

Thanx M,

All our documents are loaded, including Police clearance and Medicals...so I guess we just wait.....:blink:

Link to comment
Share on other sites

Updated our details....

February '08

Pieter&Rene.... 2008-03-06 - VISA GRANTED!!!!!!! 03 July 2009

HouseInOz ..... 2008-03-07 - VISA GRANTED !!!!!! 01 July 2009

Pygmalion ...... 2008-03-30 "26/03/09 - VISA GRANTED!"

April '08

Lisa..................2008-04-02

Gena ............. 2008-04-04 - Case officer 2009-05-01

sa2auz ........... 2008 -04-07 - Changed to ENS got it within 7 days

elize................ 2008-04-08 - Changing our application to ENS.... sick of waiting!

Tobold..............2008-04-09 - Granted 1st May 2009

Moose..............2008-04-09 - Visa approved 23/03/2009

Katy............... 2008-04-15

Scotts............. 2008-04-18 - Case officer received 2009-03-19 (Java developer)

Taegan ...........2008 -04-24 - Processing Further 2009-03-15. Changing our application to ENS.... also sick of waiting! UPDATE - PR - ENS856 Approved after 5 working days!

May '08

Lion King .........2008-05-08

Overberger ..... 2008-05-09 - Got CO requesting further info 2009-03-24, submitted all on 2009-03-27, still waiting!!!

Clarry .............2008-05-09

Sagewood .......2008-05-13 - Got CO requesting further info 2009-03-20, submitted all on 2009-03-24, still waiting!!!

psxkim .......... 2008-05-29 - Visa Granted 30 March 2009

Impatient........2008-05-12 - Got CO requesting further info on 2008-03-23

ajvr.................2008-05-20 - Got CO requesting further info on 2008-03-26 submitted all on 2009-03-30. Visa granted 24/04/2009

June '08

KimH...............2008-06-01

Wizard ........... 2008-06-03 Accountant CSL

Nolan ............. 2008-06-03 - Accountant CSL - VISA GRANTED!! - 03/04/2009

gljackson..........2008-06-06 Update - Processing Further - Documents updated to met - Requested Evidence of Specific Work Experience

Darkwing..........2008-06-20

Scarlet ........... 2008-06-28

July '08

Simpsons.........2008-07-13 - Metal machinist 4112-13

Sysie ............. 2008-07-14 - CO 3 April, VISA APPROVED !!! 1 May 2009

Bhs.................2008-07-16

Tsunabi...........2008-07-18 - Accountant - CSL

frenchie...........2008-07-23

martinp...........2008-07-27 - IT - UPDATE - Processing Further 27 Feb 09

August '08

Zambeze..........2008-08-06

OZNSW............2008-08-07 Changing to ENS. Company nomination goes in tomorrow.

Will_S..............2008-08-11 Case Officer 23-Apr-2009 - 1 Jun 2009 pre-grant letter: Visa granted 13 July 2009

The Krugers.....2008-08-11 Case Officer 23 April 09 - requested further information. VISAS GRANTED 19 JUNE 2009!!!!

Esthee..............2008-08-13

alanb...............2008-08-16 Lodged | 2009/4/24 - CO assigned. Requests PCCs | 2009/5/13 - Sent PCCs | 2009/7/20 - VISA GRANTED!

September '08

Xiongpaw ........ 2008-09-03 - J2EE Developer

Kevin Hoyle .... 2008-09-04 - J2EE Developer / CO - 2009-05-01 / PCC - 2009-07-06 / GRANTED - 2009-08-07!!!!

Duppies .......... 2008-09-04 - Accountant - Case Officer 1 May 2009 - requesting medicals

LisaS .............. 2008-09-10

mac4 .............. 2008-09-15 - 16 April changed to ss Qld

Du Toits............2008-09-26 - Visa Granted 21 May (CO 8 May)

Christo&Marie L. 2008-09-25 - Visa granted (Accountant). With no CO!: 8 May 2009!!

Vaalrivier ........ 2008-09-27 - Civil Eng / CO - 01.05.09. / Visa granted: 15.07.09

Cyberdeth ....... 2008-09-28 - GOT'S A CO 1 June, 13 days from B'day tooo, need to change some info on application though

October

elleneo.........2008-10-13-IT CSL ; 15 May'- Case Officer assigned..APPROVED 9 JULY 2009!!

tezi..............2008-10-23 CSL; 15 May - Case officer assigned requesting Aus Fed PC's. (Auckland here we come)..APPROVED 30 JUNE 2009

November '08

Wantbetter.......2008-11-01

Hennie-Pennie....2008-11-05-IT-CSL 12/05/2009 App processed further 22/05/09 CO requested PC,s 20/07 all PC's lodged 27/07/09- VISA GRANTED!!!!

Diveup ........... 2008-11-26 - Aircraft Maintenance Engineer - CSL - 22/05/2009 - CO 26-5-2009 -PC (today) Medicals completed.....waiting -VISA GRANTED!!!

Biker ............. 2008-11-28 - Got CO 25/05/2009. Request more info. Payslip for Sept 2007, Namibian PCC- WTF? UUrrgghhh! Granted 10 July- Finally!

December '08

Zet ...............2008-12-09 Accountant - CSL 25/05/2009 Application being processed further. Case Officer assigned..requests pc's.12 months payslips.

Waglio ............ 2008-12-12

DirtBiker...........2008-12-18 Accountant 175 CSL June 2009 Pcc and proof of earning and payslips.

GRANTED 22 JULY 2009

January '09

Cramer .......... 2009-01-02

Andi & Gunther 2009-01-16 Visa granted 22/09/2009 175 MODL, non CSL

March '09

Jacques and Natalie... 2009-03-06 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-03) -(PC done, Medicals done today, payslips handed in)

Emile & Ilanie...2009-03-14- (Accountant CSL) (Application being processed further 2009-09-07)

Michele R & Steve......2009-03-20 (Application being processed further 2009-09-07 (CO Requesting resubmit of my birth cert and submit Form 80 - 2009-10-07) (Application granted.....2009-10-09!!!!)

BevF ............... 2009-03-31

PeterHein ........ 2009-03-31(Application being processed further, CO requesting Medicals and PCC 2009-10-12)

June '09

Alfresco........... 2009-06-15 - .NET Technologies

Frank & Leon.... 2009-06-16 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-21)

July '09

Brendon & Sarah .... 2009-07-22 - Java Specialist 175 CSL

September '09

BenP....................2009-09-07 (Application being processed further 2009-10-01)

Carl S..................2009-09-15 (Application being processed further 2009-10-01)

Link to comment
Share on other sites

Eeek! Can't wait to apply! We should be doing our application this weekend... EEEEEEEEEKKKKKK I can't wait!!!! It's going to be our 1 year anniversary this weekend, and if DIAC processes our application in 12 months, it'll be our 2year anniversary gift if they grant us visas! :D

But really, it's been such a long wait before even applying, and now the LONGGGG wait will begin!

Link to comment
Share on other sites

February '08

Pieter&Rene.... 2008-03-06 - VISA GRANTED!!!!!!! 03 July 2009

HouseInOz ..... 2008-03-07 - VISA GRANTED !!!!!! 01 July 2009

Pygmalion ...... 2008-03-30 "26/03/09 - VISA GRANTED!"

April '08

Lisa..................2008-04-02

Gena ............. 2008-04-04 - Case officer 2009-05-01

sa2auz ........... 2008 -04-07 - Changed to ENS got it within 7 days

elize................ 2008-04-08 - Changing our application to ENS.... sick of waiting!

Tobold..............2008-04-09 - Granted 1st May 2009

Moose..............2008-04-09 - Visa approved 23/03/2009

Katy............... 2008-04-15

Scotts............. 2008-04-18 - Case officer received 2009-03-19 (Java developer)

Taegan ...........2008 -04-24 - Processing Further 2009-03-15. Changing our application to ENS.... also sick of waiting! UPDATE - PR - ENS856 Approved after 5 working days!

May '08

Lion King .........2008-05-08

Overberger ..... 2008-05-09 - Got CO requesting further info 2009-03-24, submitted all on 2009-03-27, still waiting!!!

Clarry .............2008-05-09

Sagewood .......2008-05-13 - Got CO requesting further info 2009-03-20, submitted all on 2009-03-24, still waiting!!!

psxkim .......... 2008-05-29 - Visa Granted 30 March 2009

Impatient........2008-05-12 - Got CO requesting further info on 2008-03-23

ajvr.................2008-05-20 - Got CO requesting further info on 2008-03-26 submitted all on 2009-03-30. Visa granted 24/04/2009

June '08

KimH...............2008-06-01

Wizard ........... 2008-06-03 Accountant CSL

Nolan ............. 2008-06-03 - Accountant CSL - VISA GRANTED!! - 03/04/2009

gljackson..........2008-06-06 Update - Processing Further - Documents updated to met - Requested Evidence of Specific Work Experience

Darkwing..........2008-06-20

Scarlet ........... 2008-06-28

July '08

Simpsons.........2008-07-13 - Metal machinist 4112-13

Sysie ............. 2008-07-14 - CO 3 April, VISA APPROVED !!! 1 May 2009

Bhs.................2008-07-16

Tsunabi...........2008-07-18 - Accountant - CSL

frenchie...........2008-07-23

martinp...........2008-07-27 - IT - UPDATE - Processing Further 27 Feb 09

August '08

Zambeze..........2008-08-06

OZNSW............2008-08-07 Changing to ENS. Company nomination goes in tomorrow.

Will_S..............2008-08-11 Case Officer 23-Apr-2009 - 1 Jun 2009 pre-grant letter: Visa granted 13 July 2009

The Krugers.....2008-08-11 Case Officer 23 April 09 - requested further information. VISAS GRANTED 19 JUNE 2009!!!!

Esthee..............2008-08-13 Visa FINALLY granted 27 October 2009 had a case officer in April this year already... epic wait

alanb...............2008-08-16 Lodged | 2009/4/24 - CO assigned. Requests PCCs | 2009/5/13 - Sent PCCs | 2009/7/20 - VISA GRANTED!

September '08

Xiongpaw ........ 2008-09-03 - J2EE Developer

Kevin Hoyle .... 2008-09-04 - J2EE Developer / CO - 2009-05-01 / PCC - 2009-07-06 / GRANTED - 2009-08-07!!!!

Duppies .......... 2008-09-04 - Accountant - Case Officer 1 May 2009 - requesting medicals

LisaS .............. 2008-09-10

mac4 .............. 2008-09-15 - 16 April changed to ss Qld

Du Toits............2008-09-26 - Visa Granted 21 May (CO 8 May)

Christo&Marie L. 2008-09-25 - Visa granted (Accountant). With no CO!: 8 May 2009!!

Vaalrivier ........ 2008-09-27 - Civil Eng / CO - 01.05.09. / Visa granted: 15.07.09

Cyberdeth ....... 2008-09-28 - GOT'S A CO 1 June, 13 days from B'day tooo, need to change some info on application though

October

elleneo.........2008-10-13-IT CSL ; 15 May'- Case Officer assigned..APPROVED 9 JULY 2009!!

tezi..............2008-10-23 CSL; 15 May - Case officer assigned requesting Aus Fed PC's. (Auckland here we come)..APPROVED 30 JUNE 2009

November '08

Wantbetter.......2008-11-01

Hennie-Pennie....2008-11-05-IT-CSL 12/05/2009 App processed further 22/05/09 CO requested PC,s 20/07 all PC's lodged 27/07/09- VISA GRANTED!!!!

Diveup ........... 2008-11-26 - Aircraft Maintenance Engineer - CSL - 22/05/2009 - CO 26-5-2009 -PC (today) Medicals completed.....waiting -VISA GRANTED!!!

Biker ............. 2008-11-28 - Got CO 25/05/2009. Request more info. Payslip for Sept 2007, Namibian PCC- WTF? UUrrgghhh! Granted 10 July- Finally!

December '08

Zet ...............2008-12-09 Accountant - CSL 25/05/2009 Application being processed further. Case Officer assigned..requests pc's.12 months payslips.

Waglio ............ 2008-12-12

DirtBiker...........2008-12-18 Accountant 175 CSL June 2009 Pcc and proof of earning and payslips.

GRANTED 22 JULY 2009

January '09

Cramer .......... 2009-01-02

Andi & Gunther 2009-01-16 Visa granted 22/09/2009 175 MODL, non CSL

March '09

Jacques and Natalie... 2009-03-06 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-03) -(PC done, Medicals done today, payslips handed in)

Emile & Ilanie...2009-03-14- (Accountant CSL) (Application being processed further 2009-09-07)

Michele R & Steve......2009-03-20 (Application being processed further 2009-09-07 (CO Requesting resubmit of my birth cert and submit Form 80 - 2009-10-07) (Application granted.....2009-10-09!!!!)

BevF ............... 2009-03-31

PeterHein ........ 2009-03-31(Application being processed further, CO requesting Medicals and PCC 2009-10-12)

June '09

Alfresco........... 2009-06-15 - .NET Technologies

Frank & Leon.... 2009-06-16 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-21)

July '09

Brendon & Sarah .... 2009-07-22 - Java Specialist 175 CSL

September '09

BenP....................2009-09-07 (Application being processed further 2009-10-01)

Carl S..................2009-09-15 (Application being processed further 2009-10-01)

Link to comment
Share on other sites

February '08

Pieter&Rene.... 2008-03-06 - VISA GRANTED!!!!!!! 03 July 2009

HouseInOz ..... 2008-03-07 - VISA GRANTED !!!!!! 01 July 2009

Pygmalion ...... 2008-03-30 "26/03/09 - VISA GRANTED!"

April '08

Lisa..................2008-04-02

Gena ............. 2008-04-04 - Case officer 2009-05-01

sa2auz ........... 2008 -04-07 - Changed to ENS got it within 7 days

elize................ 2008-04-08 - Changing our application to ENS.... sick of waiting!

Tobold..............2008-04-09 - Granted 1st May 2009

Moose..............2008-04-09 - Visa approved 23/03/2009

Katy............... 2008-04-15

Scotts............. 2008-04-18 - Case officer received 2009-03-19 (Java developer)

Taegan ...........2008 -04-24 - Processing Further 2009-03-15. Changing our application to ENS.... also sick of waiting! UPDATE - PR - ENS856 Approved after 5 working days!

May '08

Lion King .........2008-05-08

Overberger ..... 2008-05-09 - Got CO requesting further info 2009-03-24, submitted all on 2009-03-27, still waiting!!!

Clarry .............2008-05-09

Sagewood .......2008-05-13 - Got CO requesting further info 2009-03-20, submitted all on 2009-03-24, still waiting!!!

psxkim .......... 2008-05-29 - Visa Granted 30 March 2009

Impatient........2008-05-12 - Got CO requesting further info on 2008-03-23

ajvr.................2008-05-20 - Got CO requesting further info on 2008-03-26 submitted all on 2009-03-30. Visa granted 24/04/2009

June '08

KimH...............2008-06-01

Wizard ........... 2008-06-03 Accountant CSL

Nolan ............. 2008-06-03 - Accountant CSL - VISA GRANTED!! - 03/04/2009

gljackson..........2008-06-06 Update - Processing Further - Documents updated to met - Requested Evidence of Specific Work Experience

Darkwing..........2008-06-20

Scarlet ........... 2008-06-28

July '08

Simpsons.........2008-07-13 - Metal machinist 4112-13

Sysie ............. 2008-07-14 - CO 3 April, VISA APPROVED !!! 1 May 2009

Bhs.................2008-07-16

Tsunabi...........2008-07-18 - Accountant - CSL

frenchie...........2008-07-23

martinp...........2008-07-27 - IT - UPDATE - Processing Further 27 Feb 09

August '08

Zambeze..........2008-08-06

OZNSW............2008-08-07 Changing to ENS. Company nomination goes in tomorrow.

Will_S..............2008-08-11 Case Officer 23-Apr-2009 - 1 Jun 2009 pre-grant letter: Visa granted 13 July 2009

The Krugers.....2008-08-11 Case Officer 23 April 09 - requested further information. VISAS GRANTED 19 JUNE 2009!!!!

Esthee..............2008-08-13 Visa FINALLY granted 27 October 2009 had a case officer in April this year already... epic wait

alanb...............2008-08-16 Lodged | 2009/4/24 - CO assigned. Requests PCCs | 2009/5/13 - Sent PCCs | 2009/7/20 - VISA GRANTED!

September '08

Xiongpaw ........ 2008-09-03 - J2EE Developer

Kevin Hoyle .... 2008-09-04 - J2EE Developer / CO - 2009-05-01 / PCC - 2009-07-06 / GRANTED - 2009-08-07!!!!

Duppies .......... 2008-09-04 - Accountant - Case Officer 1 May 2009 - requesting medicals

LisaS .............. 2008-09-10

mac4 .............. 2008-09-15 - 16 April changed to ss Qld

Du Toits............2008-09-26 - Visa Granted 21 May (CO 8 May)

Christo&Marie L. 2008-09-25 - Visa granted (Accountant). With no CO!: 8 May 2009!!

Vaalrivier ........ 2008-09-27 - Civil Eng / CO - 01.05.09. / Visa granted: 15.07.09

Cyberdeth ....... 2008-09-28 - GOT'S A CO 1 June, 13 days from B'day tooo, need to change some info on application though

October

elleneo.........2008-10-13-IT CSL ; 15 May'- Case Officer assigned..APPROVED 9 JULY 2009!!

tezi..............2008-10-23 CSL; 15 May - Case officer assigned requesting Aus Fed PC's. (Auckland here we come)..APPROVED 30 JUNE 2009

November '08

Wantbetter.......2008-11-01

Hennie-Pennie....2008-11-05-IT-CSL 12/05/2009 App processed further 22/05/09 CO requested PC,s 20/07 all PC's lodged 27/07/09- VISA GRANTED!!!!

Diveup ........... 2008-11-26 - Aircraft Maintenance Engineer - CSL - 22/05/2009 - CO 26-5-2009 -PC (today) Medicals completed.....waiting -VISA GRANTED!!!

Biker ............. 2008-11-28 - Got CO 25/05/2009. Request more info. Payslip for Sept 2007, Namibian PCC- WTF? UUrrgghhh! Granted 10 July- Finally!

December '08

Zet ...............2008-12-09 Accountant - CSL 25/05/2009 Application being processed further. Case Officer assigned..requests pc's.12 months payslips.

Waglio ............ 2008-12-12

DirtBiker...........2008-12-18 Accountant 175 CSL June 2009 Pcc and proof of earning and payslips.

GRANTED 22 JULY 2009

January '09

Cramer .......... 2009-01-02

Andi & Gunther 2009-01-16 Visa granted 22/09/2009 175 MODL, non CSL

March '09

Jacques and Natalie... 2009-03-06 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-03) -(PC done, Medicals done today, payslips handed in)

Emile & Ilanie...2009-03-14- (Accountant CSL) (Application being processed further 2009-09-07)

Michele R & Steve......2009-03-20 (Application being processed further 2009-09-07 (CO Requesting resubmit of my birth cert and submit Form 80 - 2009-10-07) (Application granted.....2009-10-09!!!!)

BevF ............... 2009-03-31

PeterHein ........ 2009-03-31(Application being processed further, CO requesting Medicals and PCC 2009-10-12)

June '09

Alfresco........... 2009-06-15 - .NET Technologies

Frank & Leon.... 2009-06-16 - C# (.Net Technologies Specialist) - (Application being processed further 2009-09-21)

July '09

Brendon & Sarah .... 2009-07-22 - Java Specialist 175 CSL

September '09

BenP....................2009-09-07 (Application being processed further 2009-10-01)

Carl S..................2009-09-15 (Application being processed further 2009-10-01)

October '09

Kit..................2009-10-28 (IT CSL)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...